More ceiling panels to go up

The ceilings almost done

One of the things most people don’t like doing is working over head, but the ceiling has to be done. As we had already cut all the sheets it was just a matter of pop riveting them up in place. This time the ceiling is not flat so it was just a matter of hold it up as best we could and start gluing and riveting as we go.

Lets just get it done.
There is so much crap still in the coach to work around.
Hard at work
Still working
The pneumatic riveter makes the job so much more enjoyable.

Bathroom all finished
Thank goodness for timber props
Now halfway through the kitchen.
That will do for now.

We will be finishing off the ceiling later on as I’ll be covering up the front hatch and don’t have the time right now. It was tricky getting it just right with the sheeting needed little adjustments just before gluing. The main work is now needed down the back of the coach as getting the bedroom finished to a stage that we can move back in after we leave this house sitting job at the end of October is our priority.

 

2 thoughts on “More ceiling panels to go up”

    1. Thanks Heather we are working on the bathroom floor and walls now.

Comments are closed.