Time to get my draws on

Draws for the vanity

After finishing the vanity and fitting the sink in place with all the plumbing, now was the time for the draws. There will be three a deep draw down the bottom and two smaller draws above that, which will have to be modified to fit around the plumbing.

More draws to make.
One down two more to go.

Now the fun begins

The bottom draw just missed the s/trap which was good, but the next two won’t be so lucky. I’ve even dropped the draw runners down  as fare as I can go so we have more room for the top draw.

Cut out for middle draw for the P/trap.
Look it fit’s.

Now that was not to bad, but the top draw is going to be another thing. I’ll be left with only around 220mm of draw space on either side of the sink and 60mm at the front of the draw, but that should be heaps of space for Charmaine.

Top draw not as much fun.
Covering up the timber bit’s.
How to make one draw into two.
Even have somewhere for the toothbrushes.
Didn’t lose to much space in the second draw.

Well I’m glad that’s over, but I will properly going to have the same thing in the kitchen though.

 

 

One thought on “Time to get my draws on”

Comments are closed.