Kitchen wall this time

Walls Walls Walls

The kitchen walls are the next job on my list, as we have worked from the back of the bus to the front. building as we go, or making it up as we go, as we have never done anything like this before. By the time we have finish the motorhome We might know how to build one.

So now that the floor in the kitchen is down the wall are next. This means more sparky stuff for power points and light switches too. there is too much to think about some times, but it’s better to get it right now. Like gluing the insulation into place one of the job I don’t like.

It’s nice to be putting the walls up.
Insulation glued up in place.
Mid timber packer in place, screwed and glued.
Driver side insulation up in place.

On the driver’s side I also had to cut out holes for the fridge vents, that I’ve already talked about.

Fridge vents cutouts were in the right place.
Now thats finished, time for the next sheet to go up.
That’s as fare as I can go on this side for now.

Some plumbing & sparky fun

There are so many things to do when it comes to power and water, the main thing is to get them in the right place. The dishwasher and kitchen sink will beside each other on this side. The wall oven is going above the dishwasher, so will have to have 240v for both. Then I’ll be running 12v cable for the lighting for both sides of the kitchen, there will be lots of lighting options from low lights top ceiling lights.

Plumbing for the dishwasher & kitchen sink as well as power for wall oven & dishwasher.
240v for the power point and 12v for the light switch.
Every cable is tagged so I know were it go’s.
Lot’s of lighting options here, should look great when it’s finished.
240v and 12v cables in place for the fridge and range hood as well as a power point.