We are in two minds as to what finish we will be putting on the bedroom walls, so for now we will be painting them to hide the ply wood. If nothing else it will make us feel more at home instead of inside a wooden box.
Charmaine was happy to get stuck into the painting as she has been out working making the money to keep the project going. Now she can help out working on the motorhome on some of her days off.
We are putting on two coats of undercoat and sanding between them to smooth it off then another two topcoats should see the job done. It already made the bedroom look a lot brighter just with the first base coat on.
Well that makes a difference to the bedroom, it may only be temporary but that will do till we know what we will be finishing off the walls with. The next job will be finishing off around the cabinets and some sparky stuff.
We started in the bedroom and that’s all we were going to do, but why stop there as it was a dirty job. So it was out with the scrapers again to remove the form underlay, only another 8 meters to go. I so much love working over my head.
Now to start on the new ceiling.
Well it’s now time to start on the new bedroom ceiling as It had to be finished so I could fix the roof above. Des had the sheetmetal already, so it was time to cut it up and start fitting it up in place.
Now the fun beginnings of positioning them in place with Charmaine’s help and some timber I think we can do it. This will be done one sheet at a time as gluing them in place takes 24hrs, then the pop riveting and then we do it all over again with the next one.
Now that we have done the ceiling in the bedroom, the rest will have to wait for another day and another blog.
This hatch will be used to get up on to the roof top deck later on, but till then I’ve had to fix the struts as the old ones were falling apart. We have been using the hatch for fresh air and light and the plastic struts just were not meant  to be used on a daily basis. I have had some gas struts for another job, so time for some modifications.
How to get up there
We will be looking at setting up a ladder later on after the bathroom is finish. There has to be some more work on the hatch as it will have to open up, so I’ll have to make some hinges to fit the roof profile as well as a latch system to keep it closed, fit some bigger gas struts to hold it up in place when it’s open.
Why waste the space from the old air conditioning?  We have decided to turn it into our roof top deck. There was some eco decking on special at Bunnings so we couldn’t pass it up. We had to come up with some idea because when it rains it was filling up with water, not that it was leaking but the sound of it dripping when in bed made it sound like it was, so you would keep waking up looking for leaks. We only found this out when we were camping on the floor of the bus on our trip down the East coast to Brisbane.
The first job was to fill in under the fiberglass area where we cut out for the walk way and then seal it up.
Now for the decking
Apart from climbing up and down the ladder what felt like hundreds of times, this job was pretty straight forward. My legs and lower back are feeling it now. I had to first set out for the deck supports then pop revetting them in place, it was just a matter of cutting the decking to size, screwing and lastly gluing them into place. It was important to prevent any water getting under the decking so I sealed every joint with sikaflex. I also decided to use expanding foam under the deck for insulation.
Job Done
The slates down the back are for the air flow and to let the water out when it rains. We will be putting the sola panels back up over the deck temporarily till the budget allows us to cover from the front of the coach to the back hatch. Now it’s time to get back inside and do some more work on the bedroom.
The cost of the weekly food bills are going up…this is a fact. So how do we make the most of our hard-earned money when it comes to shopping? There are so many things all of us can do to keep the cost down.
Grocery advice on specials
I personally do not have time to troll through the specials that come in the mail or through targeted emails from our favourite grocery stores. Most of the basic advice on doing the shopping I do adhere to……The top of my list is that I do not go to do grocery shopping  when I am hungry, this is very useful for me keep in mind.
A basic shopping list
I used to have a basic shopping list of what I had to get and then top it up with things that caught my eye, but even this approach to shopping would have me spending way more than I had expected by the end.
Under $10 meal deals
Some supermarkets are trying to help families out by making $10 Â meal ideas, these are good if you have family and have trouble thinking outside the box. There are a few problems I have with this marketing angle from certain supermarkets.
Most meals require you to buy a lot more than is needed for that one meal.
A lot of the meals don’t cater for those with diet requirements.
I have noticed that a lot of these meals do not have quiet enough veggies in them for our daily requirements.
I have at times made meals using these recipes and have frozen the rest for more meal later as there are only two of us. I have also reduced the amount of meat in these recipes an added more veggies which significantly brought the cost of the meals down to even $6 instead of $10.
If you adapt you will save…Big time!!
Just recently I have decided to take a whole new approach to shopping and am saving a lot of money….Be on the look out for my next blog where I will explain it in detail.
Well, it will I guess as we are almost there, it wont be long. All that is left is to clean up before water proofing the roof. I must say it has taken longer than I thought, but that seems to be what happens fitting out a coach into a motorhome. We had intermitted rain for some of this part of the water proofing section. Not only did I have to pump the excess water out of the roof area every time it rained, but then had to wait till it was fully dry before starting on it again.
I had run out of supplies a few times this week so it was handy that the hardware is nice a close. If we were still at Leigh Creek it would have been a 5 hour round trip to go pick up more things.
These are the only times I like being in the city.
Now that the water proofing has been done, we have decided a roof top deck would be a nice touch to the roof finish off. This will give us some more room, this one with a great views. We are not sure what type of chairs or table we want up on the deck. It will have to be fixed to the side some how, so we are leaving that for later on to do. I also am going to fix a wind turbine onto this area as well but again not sure how just yet. I guess all this will come to us over time. So this thankfully will the last blog on the old air-conitioning.Â
Starting from the back of the coach to the front is the only way to go. Under the bed area is where the motor is, so the floor has a raised part, this is a great place to put in bedroom cupboards. With nothing being square or plum apart from the floor I was making it up as I went along. It’s nothing like building a house!
Time for some sparky stuff
At this stage it was time to run some 12 volt cables for the LED lights as well as some USB chargers on either side of the bed. We need some speaker cables put in as well for the stereo that was going to go in later on. We are not running 240 volt in the bedroom as there is nothing we can think of that we need it for down this section of the bus so 240 volt is it .
I have some fiddle bits of trim around the cupboards, which will be done later on when we get some other work out of the way first. All we have to do now is fit the draw runners on before putting the draws.
We have not decided what we actually want the walls to look like, there has been some ideas floating around but nothing that really makes us confident to want to finish them now. So I will be tidying up the bedroom walls with more ply where all the power cables run and then painting them till we find what kind for finish we are looking for.
Just recently, I heard that some companies are doing away with cash transactions all together and card only will be excepted with these certain establishments. Bernie and I are totally doing the opposite when it comes to starting our coffee shop on the road….That’s right you heard it here first!…Bernie has a great idea to use part of the bin space under the bus near the front door for our pull out cafe.
Affordable food on the road
Right now it’s just an idea, a concept that has to be fully planned out, but one thing is for sure we are only selling to people with notes and coins and not card. This is one way to keep costs down so we can make good quality organic food and coffee more affordable to those on the road. Â Why give the banks our profits when we can give it back to our customers instead.
Empower people to make a real choice
Some people may say that this is going to make us loose customers, yeh that’s most probably true. Providing a cash only cafe gives the people the money in their pockets and not the banks. We want to empower people to have the choice in making real savings without loosing out on quality, these days this very choice is getting much much harder to find. If the banks show some initiative and offer a better solution to cashless transactions then of course we would consider it, but until then, it’s cash.
Another way we want to be empowered to save is to encourage people to use their own cups and get a further discount on their coffee purchase, we may call it something like ‘your cup discount’. We are all for recycling as much as possible and help customers do the same. If you have a good idea please leave a comment and we may use it….all ideas are helpful.
We had already done the first part of the work on the bedroom ceiling, but to finish that job. We had to rip the rest of the old air-con off the roof. I started with getting the sola panels off first, then remove the cover plates.
This will be the last time it will look like this.
The finished look of this project we will have a roof top deck up here, but not now that is a job for an other day. Now it’s time to remove the evaporator, heat exchange radiators and blowers. Stripping out the copper pipe, heat exchange radiator pipes as well all the electrical pits.
More Stuff For The Scrap Yard
I did a trip to the scrap metal yard with all the copper, brass, evaporator and the heat exchange radiators. It’s always good to get some money back, that lot gave me $145 to put back into the project. Next will be cutting out all the aluminium  that we don’t need off the roof air-condition area. I all ready have some that we have removed so that we will have an other trip to the scrap yard soon.
Did I see rain?
Well it did start raining on and off for a week, lucky we could put the covers over the holes and with some buckets inside it didn’t get too wet inside. This means I went back inside to do some more work on the bedroom/bathroom ceiling, while it rained but thats an other blog.
From the start the old coach air conditioning never worked at all, the gas was gone and Des had already fitted a reverse cycle air conditioner into the coach before it ever became our project. I started to remove the old air-con in Leigh Creek S.A. in my free time.
The coach is getting lighter.
After taking out the compressor pump, which almost made me blow a pooper valve. After the compressor out it was onto the roof to remove the condensers and fan system. Now the coach is about 120kg lighter, every bit counts the lighter the better.
Now Time To Pack Up.
It was starting to get to hot to be working on the roof at that time of the year in Leigh Creek S.A.  So before I put the panels back on we used this area store the spare set of wheel for the Toyota land cruiser. The next stop was to Yulara N.T. to do some camel farm work  which was great fun especially getting to race at the end of May in the camel races.  Curtin Springs Cattle Station was a six day a week job so not much could be done on the bus when we were there, until Zac came up for a trip to do the outside just before we left there in November 2016.
One of the main reasons we decided to head back to Brisbane was that we realised we could not both work and get the bus built properly. The other reason was that while in Yulara we bought a gas strut storage bed that costed us $500 and by the time we got it out to us at the farm it costed another $480. This was way too expensive, so on to Brisbane it was as we found out it was the cheapest way to get the parts we would need for the fit out on the bus.