Tag Archives: Bathroom wall’s

Bathroom vanity wall time

Setting up for the black mirror area

But first I’ll have to run some 12v cables for the LED lights for the vanity as well as the laundry area so they can be switch on by them self. Than we will need 240v power for the front load  washing machine under the bench, some were  as well as a power point.

Power for the washing machine.
240v ran in the conduit and 12v for the vanity light.
More power bits. On this side will be the start of the kitchen.
12v power for the LED lights and a 240v power point.
I’m leaning the wall back at the top so I can see in the mirror.
First ply board in place.
That side is finish for now.

Clean up time

Now that is done it will be time to start cleaning up as I’ve made a mess, our house sit is getting close to ending and we will need time to organize the coach back into some kind of a place we can live in again. I’ve still have to put the sola panels back on and rewire then and a bit more to tidy up outside before we can start packing up.

 

Bathroom wall’s to go up

Getting closer to having a bathroom

With the bathroom floor in place and water proofed it’s now time to start on the walls. But first we have to work out were the toilet window will go and lets hope it’s in the right place.

Passenger side marking out for toilet window.
Let’s hope it’s in the right place.
We have a hole in the side of the motorhome.
One toilet window in place.
Window from the inside.

Now to start on the wall’s

First off is to cut the insulation followed by gluing it in place, a job I love to hate. Second stage is to cut the first sheet of ply to size and making sure the window is cut out in the place. Now it’s time to start fitting it to the side of the coach.

Gluing the insulation in place.
That will do for now.
1st wall sheet up with window cut out.

There will be one more sheet put up on this side for the moment which will finish off the bathroom wall and part of the kitchen.

The shower and toilet side is done.

The vanity and laundry side

This side will be straight forward as there is no window to go on this wall at all. So it’s just gluing the insulation in place then cutting the ply to size. Screw some packing in place so I can glue and screw the ply to the wall.

Vanity and laundry side, with packing screwed into place.
More insulation in the wall cavity.
Insulation all in.
One more sheet to go.
Drivers side done in the bathroom.
Looking from the front of the coach at the bathroom.
Some more sparky stuff.
Top of the toilet and shower wall finished.
240v for a power point in the vacuum cupboard and 12v for a toilet light.
Start of the wall between the bathroom and kitchen.
Bathroom / laundry side.
Just needs painting now.

After running some more power cables around the top of the walls and finishing off the transition from the walls to the ceiling. Just some more painting for Charmaine to do to finish off the bathroom walls for now. Look’s like the next project will be to build some wardrobes to close off the bedroom from the bathroom.