Bedroom Walls & Windows

Time For Some Inside Work

Now with the roof fixed while in Bowen, it was time to start on the bedroom. The first thing was the windows…. I had to remove the old toilet window which Des had put in, because for us it was in the wrong place.

Time to remove the old window so we can fit the new one’s
Replacement toilet window.
Old window out, now to patch up.
Des had kept the old panel he cut out for the window he put in.
Old panel back in place.
No more whole.

Time For Some Walls

With the window in place it was back inside to fit the insulation and wall paneling 16mm ply the we got when living in Yulara N.T.  First thing was to remove the old aluminium sheetmetal so we could put in the new insulation.

Removing old sheet metal to put the new insulation in.
Aluminium sheetmetal off

With the inside panels going on its starting to look more like a bedroom, later we will be putting some kind of lament over the ply to finish it off.

Right side insulation and paneling going on.
Charmaine doing some OH & S, Insulation in and starting on the timber paneling after fitting the bedroom window on the left side.
One side done one side to go.
Bedroom ready for the trip down the Queensland coast from Bowen.

So with the bedroom side walls in place it was time to set up the new sleeping area for the next part of our trip down the Queensland coast. We also had to re pack all the stuff we moved into the shed while house sitting in Bowen.

One step closer to having a motorhome, so the dream’s getting their slowly but we are on our way.

2 thoughts on “Bedroom Walls & Windows”

    1. Thanks Heather
      We are working on the bedroom ceiling and just remove the old coach air-con off the roof above the bedroom. Blog to come soon.

Comments are closed.