The last bit to go on the coach old air conditioning

Will this ever end?

Well, it will I guess as we are almost there, it wont be long. All that is left is to clean up before water proofing the roof. I must say it has taken longer than I thought, but that seems to be what happens fitting out a coach into a motorhome. We had intermitted rain for some of this part of the water proofing section. Not only did I have to pump the excess water out of the roof area every time it rained, but then had to wait till it was fully dry before starting on it again.

I had run out of supplies a few times this week so it was handy that the hardware is nice a close. If we were still at Leigh Creek it would have been a 5 hour round trip to go pick up more things.

These are the only times I like being in the city.

Just the last bits of cutting things away before we finish doing the water proofing.
Now ready for water proofing.
Undercoating done.
1st coat of water proofing.
This is after the 3rd coat and I think this will be all.

Now that the water proofing has been done, we have decided a roof top deck would be a nice touch to the roof finish off. This will give us some more room, this one with a great views. We are not sure what type of chairs or table we want up on the deck. It will have to be fixed to the side some how, so we are leaving that for later on to do. I also am going to fix a wind turbine onto this area as well but again not sure how just yet. I guess all this will come to us over time. So this thankfully will the last blog on the old air-conitioning.