Tag Archives: Building A Motorhome

Bed frame this time

The bedroom needs a bed

We had already got the bed when we were in Yulara N.T. so now it was time to put it all together. Being that nothing is fitting out of the box things will have to be cut to shape to fit in place. The bed head will be to high to start with so that was cut down to size and fitted between the bedside draws.

The bed head cut down to size and only just fitted between the draws.

Because we had to lift the bed up 150mm to fit into place over the motor area, the bed sides will still need around 100mm cut out of them near the bed head.

This will be fitted over the engine bay
Not what I expected on the inside.
Now lets hope it fits.
Now it will fit over the engine bay.
Setting up for the bed sides.
Screw nuts now in place.
Ok that’s the bed frame done.

Something to hold the bed up with

Now that the beds in place we still have to build something to hold the bed off the floor. We will be back setting this so you can put your feet under the bed by around 90mm as we don’t have much room down either side of the bed.

The start of the bed support, screw and glue as we go.
That’s the upright bit done.
From the front side with a kick board look.
A test run.
Finishing off with some left over material.
That looks better.
Bed support in place.
Looks like it was made that way.
I’ll be putting on the slats in later as they will only be in the way now.

Well that turned out better than I thought, now it’s done. The gas struts work well so we have more storage under the bed, you can never have too much storage space in a motorhome so the more the better. There is also a place were you can open up to work on the top of the gearbox under here too, lets hope not. I’ve also made a draw that slides down the old walkway that goes under the floor for more storage, which makes Charmaine very happy, she loves it.

Bedroom back walls and the fiddly bits

The fun of filling in the gaps

As nothing is square in the bus, there is always going to be gaps somewhere and they can be put to good use. It’s more ass than class but to my surprise things are fitting into place, if only….. just. On either side of the top cabinets we are putting in some speakers for the surround sound.

This is the odd shapes you have to work with.
Looks like a good place to fit some speakers, don’t you think?
Now for the other side
Bit by bit it’s going together.
Fiddly bits
Now we have somewhere for the back speakers.
Sound for the bedroom
That is the top half done.

Now for the bottom half

This is a bit more tricky as there is not much room to work with and the shape has to be exact. I will be trying to put a USB charger, AUX and a USB to the stereo on either side of the bed next to the middle cabinets and the wall.

Not much timber to work with here.
Where does the time go ???
It looks a mess from the back.
Lets hope we soldered the wires in the right place.
Phone charging points that can be switched off, AUX and USB back to the sound system.
Job finished.

There was no room to spare at all, but that was a painful job and one that I’m glad is now over. I sometimes have some great ideas that I end up wishing I hadn’t had, but the job is done now.

More ceiling panels to go up

The ceilings almost done

One of the things most people don’t like doing is working over head, but the ceiling has to be done. As we had already cut all the sheets it was just a matter of pop riveting them up in place. This time the ceiling is not flat so it was just a matter of hold it up as best we could and start gluing and riveting as we go.

Lets just get it done.
There is so much crap still in the coach to work around.
Hard at work
Still working
The pneumatic riveter makes the job so much more enjoyable.

Bathroom all finished
Thank goodness for timber props
Now halfway through the kitchen.
That will do for now.

We will be finishing off the ceiling later on as I’ll be covering up the front hatch and don’t have the time right now. It was tricky getting it just right with the sheeting needed little adjustments just before gluing. The main work is now needed down the back of the coach as getting the bedroom finished to a stage that we can move back in after we leave this house sitting job at the end of October is our priority.

 

Putting some paint on to hide the ply wood

Something to hide the ply with.

We are in two minds as to what finish we will be putting on the bedroom walls, so for now we will be painting them to hide the ply wood. If nothing else it will make us feel more at home instead of inside a wooden box.

Charmaine putting on the first undercoat of two.

Charmaine was happy to get stuck into the painting as she has been out working making the money to keep the project going. Now she can help out working on the motorhome on some of her days off.

She is having fun 🙂

We are putting on two coats of undercoat and sanding between them to smooth it off then another two topcoats should see the job done. It already made the bedroom look a lot brighter just with the first base coat on.

First coat on need to give it a light sand down then for the second coat.
Topcoat cut in.
One more coat of paint after this one.
Well that makes a difference.

Well that makes a difference to the bedroom, it may only be temporary but that will do till we know what we will be finishing off the walls with. The next job will be finishing off around the cabinets and some sparky stuff.

 

Why Stop at The Bedroom Ceiling

Lets just finish the ceiling prep

We started in the bedroom and that’s all we were going to do, but why stop there as it was a dirty job. So it was out with the scrapers again to remove the form underlay, only another 8 meters to go. I so much love working over my head.

So much fun I love my job.
This is after sanding all the contact glue off the ceiling
Halfway there.

Now to start on the new ceiling.

Well it’s now time to start on the new bedroom ceiling as It had to be finished so I could fix the roof above. Des had the sheetmetal already, so it was time to cut it up and start fitting it up in place.

The sheet metal that will be going up for the ceiling.
Time to cut it all to length.
This lot should do the bedroom through to the bathroom.

Now the fun beginnings of positioning them in place with Charmaine’s help and some timber I think we can do it. This will be done one sheet at a time as gluing them in place takes 24hrs, then the pop riveting and then we do it all over again with the next one.

The 1st sheet in place.
pop riveting done on the first sheet.
Onto the 2nd sheet.
Most of the bedroom ceiling done as well as the bit from the flat to the curve ceiling.

Now that we have done the ceiling in the bedroom, the rest will have to wait for another day and another blog.

Hatch Problems

Just a patch up job

This hatch will be used to get up on to the roof top deck later on, but till then I’ve had to fix the struts as the old ones were falling apart. We have been using the hatch for fresh air and light and the plastic struts just were not meant  to be used on a daily basis. I have had some gas struts for another job, so time for some modifications.

One stuffed hatch
Bathroom hatch has buggered struts
New fittings to the hatch for the gas struts.
Some new gas ones go on.
Fittings for the roof.
That will do me till this hatch turns into the way up to the roof top deck.

How to get up there

We will be looking at setting up a ladder later on after the bathroom is finish. There has to be some more work on the hatch as it will have to open up, so I’ll have to make some hinges to fit the roof profile as well as a latch system to keep it closed, fit some bigger gas struts to hold it up in place when it’s open.

From Old Air-Conditioning To Roof Top Deck

Everyone loves a nice deck

Why waste the space from the old air conditioning?  We have decided to turn it into our roof top deck. There was some eco decking on special at Bunnings so we couldn’t pass it up. We had to come up with some idea because when it rains it was filling up with water, not that it was leaking but the sound of it dripping when in bed made it sound like it was, so you would keep waking up looking for leaks. We only found this out when we were camping on the floor of the bus on our trip down the East coast to Brisbane.

The first job was to fill in under the fiberglass area where we cut out for the walk way and then seal it up.

Time for some sheetmetal work to start with.
The areas I have to fill in on either side of the walkway.
Marking it all out.
The cut.
Cut to size just need to bend it to shape.
Now let’s hope it fits in the hole.
The back side.
Well it fitting in nicely….. just.

Now for the decking

Apart from climbing up and down the ladder what felt like hundreds of times, this job was pretty straight forward. My legs and lower back are feeling it now. I had to first set out for the deck supports then pop revetting them in place, it was just a matter of cutting the decking to size, screwing and lastly gluing them into place. It was important to prevent any water getting under the decking so I sealed every joint with sikaflex. I also decided to use expanding foam under the deck for insulation.

Aluminium glue and pop riveted into place for the walk way to the deck.
The walkway from the hatch to the decking almost there.
Starting from the back screwing and gluing as we go.
The white silicon is where the pop rivets from the ceiling come through.
Halfway there.
Got to love the expanding foam, great insulation.
Well the decks down,
Looking from the back.
The back strips are in place.
Now the fiddly bits….. the air is sucked out from inside through this boxed off area.
Another job finished.

Job Done

The slates down the back are for the air flow and to let the water out when it rains. We will be putting the sola panels back up over the deck temporarily till the budget allows us to cover from the front of the coach to the back hatch. Now it’s time to get back inside and do some more work on the bedroom.

Old Air-Conditioning, Part 1, Part 2

The last bit to go on the coach old air conditioning

Will this ever end?

Well, it will I guess as we are almost there, it wont be long. All that is left is to clean up before water proofing the roof. I must say it has taken longer than I thought, but that seems to be what happens fitting out a coach into a motorhome. We had intermitted rain for some of this part of the water proofing section. Not only did I have to pump the excess water out of the roof area every time it rained, but then had to wait till it was fully dry before starting on it again.

I had run out of supplies a few times this week so it was handy that the hardware is nice a close. If we were still at Leigh Creek it would have been a 5 hour round trip to go pick up more things.

These are the only times I like being in the city.

Just the last bits of cutting things away before we finish doing the water proofing.
Now ready for water proofing.
Undercoating done.
1st coat of water proofing.
This is after the 3rd coat and I think this will be all.

Now that the water proofing has been done, we have decided a roof top deck would be a nice touch to the roof finish off. This will give us some more room, this one with a great views. We are not sure what type of chairs or table we want up on the deck. It will have to be fixed to the side some how, so we are leaving that for later on to do. I also am going to fix a wind turbine onto this area as well but again not sure how just yet. I guess all this will come to us over time. So this thankfully will the last blog on the old air-conitioning. 

It’s bedroom time

Time to start fitting out the bedroom

Starting from the back of the coach to the front is the only way to go. Under the bed area is where the motor is, so the floor has a raised part, this is a great place to put in bedroom cupboards. With nothing being square or plum apart from the floor I was making it up as I went along. It’s nothing like building a house!

The back bedroom wall before we started
Lots of flat pack cupboard boxes to make up from Bunnings.
Plains? Who needs plains….
First one done and lots more to go.
The bed should fit between the two bedside draws.
One bit at a time, this cover goes on so more draws can go on top.
These two tall ones will have shelves.
Back to Bunnings for more stuff.
Time to put some support in place and insulation before I go too far.
One more box and this level will be done.
The fun of making boxes up.
With the black timber in place it only just fitted after shaving the back edges off the side boxes.
One more level after this one.
They only just made it in after Shaving off some timber.
No turning back now time to screw it in place.
A very tight fit.
More boxes to make up for the top level
Almost there.
We are getting closer.

Time for some sparky stuff

At this stage it was time to run some 12 volt cables for the LED lights as well as some USB chargers on either side of the bed. We need some speaker cables put in as well for the stereo that was going to go in later on. We are not running 240 volt in the bedroom as there is nothing we can think of that we need it for down this section of the bus so 240 volt is it .

All the power cables for the lights, USB charges and the stereo speakers are in. Lets hope that is all of it.

 

Time to fit in the down light before I go to far.
Holes are in place.
LED Lights are in place.
12v cables are in place as well as the insulation.
You can turn the LED lights any colour you like.
Now the led light strip in place and all powered up.

I have some fiddle bits of trim around the cupboards, which will be done later on when we get some other work out of the way first. All we have to do now is fit the draw runners on before putting the draws.

We have not decided what we actually want the walls to look like, there has been some ideas floating around but nothing that really makes us confident to want to finish them now. So I will be tidying up the bedroom walls with more ply where all the power cables run and then painting them till we find what kind for finish we are looking for.

 

 

 

 

No Cash No Coffee

The introduction of a cashless society

Just recently, I heard that some companies are doing away with cash transactions all together and card only will be excepted with these certain establishments. Bernie and I are totally doing the opposite when it comes to starting our coffee shop on the road….That’s right you heard it here first!…Bernie has a great idea to use part of the bin space under the bus near the front door for our pull out cafe.

Affordable food on the road

Right now it’s just an idea, a concept that has to be fully planned out, but one thing is for sure we are only selling to people with notes and coins and not card. This is one way to keep costs down so we can make good quality organic food and coffee more affordable to those on the road.  Why give the banks our profits when we can give it back to our customers instead.

Empower people to make a real choice

Some people may say that this is going to make us loose customers, yeh that’s most probably true. Providing a cash only cafe gives the people the money in their pockets and not the banks. We want to empower people to have the choice in making real savings without loosing out on quality, these days this very choice is getting much much harder to find. If the banks show some initiative and offer a better solution to cashless transactions then of course we would consider it, but until then, it’s cash.

Another way we want to be empowered to save is to encourage people to use their own cups and get a further discount on their coffee purchase, we may call it something like ‘your cup discount’. We are all for recycling as much as possible and help customers do the same. If you have a good idea please leave a comment and we may use it….all ideas are helpful.