The last window is going in.

Another job finished.

This is the last window to be fitted and that means one less job that needs to be done. Just have to mark out where the window has to go first, then double check it to make sure it’s in the right place.

Another hole in the side of the coach.
The last major cut has been done.

Now all I have to do is rip down some timber for the size to fit around the window hole. A little bit more gluing, screwing and that job is all done.

Timber surround in place.
The last window is now in.

The window frame has been sealed and screwed from the out side.

Now that is the last one finished.
The other side.
From outside.
Drivers side.
Passengers side.

Well that makes a big difference to the outside, now it’s starting to look like our home on wheels. It’s so nice to see the job list being ticked off one by one.  Once I have worked on finishing the front floor and walls,… all that will be left to do is fitting out.